Company NewsLatest NewsTrade news
Work is the most glorious-salute to the pipe man who sticks to his post

Workers are the loveliest; workers are the most glorious; workers are shining.

Today is the "May 1st" Labor Day. Every worker in Anyuan Pipeline Company's various positions is amazing. I would like to give a compliment to myself who have worked hard. pay tribute! Keep improving, perfect labor spirit, craftsman spirit!

Marketing Center: According to the salesman's stocking list and inventory, release the production plan, and send the plan list to the logistics department, quality and safety department and production workshop;

Logistics Department:

Sort out the delivery notice and submit it to the delivery staff of the logistics department, who will arrange the delivery according to the marketing plan;

The warehousing personnel go to the production workshop to count the number of pipes and fittings;

The warehouse clerk distributes materials according to the batching list of the production workshop;

The transfer team waits for the quality inspector to inspect the product and then enters the warehouse.

1:30 to hold a shift meeting to convey the spirit of the company's early adjustment meeting, emphasizing safety and loading conditions;

Quality and safety department: clear division of labor, on-site inspection, warehouse inspection, factory inspection, safety inspection, sampling suppression test;

Technical department: sort out the technical requirements of large pipe fitting machines and supporting equipment mold temperature controllers, and then go to the workshop to verify the technical requirements; return to their jobs to study the technical transformation project; assist the workshop to solve the equipment "difficult and miscellaneous diseases".

Production workshop: 2:40. The leader on duty on the day will participate in the shift meeting of the production workshop, and the two shift leaders will carry out the handover of safety, production tasks, equipment operation status, and civilized production. The squad leader assigns a shift according to the production plan and makes a safety clarification.

The operator enters the production workshop, puts the mobile phone into the mobile phone storage box, goes on duty to check the appearance of the pipe, check the wall thickness and pipe diameter, turn the material, check whether the temperature is normal on the electrical instrument, the equipment operation, and replace the warp and weft lines;

Various positions

Hotline

0799-6796868

Scan Follow Us