Company NewsLatest NewsTrade news
Grasp management and promote improvement | Anyuan pipeline is in action

In November this year, it was the activity month of “Grasping Management and Promoting Improvement” of Jiangtou Group. According to the six self-inspection tables, Pingkuang Group further promoted the “three major management improvement activities” for office space, environmental sanitation, and production sites, and established accordingly Three special working groups conduct on-site inspections, supervision and guidance for all units.

Anyuan Pipeline Company took active actions and rushed to rectify and reform. A touch of "dark blue" and "orange and yellow" are active in every corner, a pair of hot labor scenes are impressive, and the neat and orderly workplaces are refreshing. This is the implementation of Anyuan Pipeline Company to "grasp management and promote improvement." "A true portrayal of the special event. The company self-examined 19 problems, and 15 rectifications have been completed; 27 problems supervised by the superiors, 16 rectifications have been completed.

Recently, the four party branches of the company also organized a party day event with the theme of “Grasp management and promote improvement”, organized party members to carry out extensive voluntary labor, and carried out a thorough environmental cleaning operation in the sanitary area. Weeds, garbage, All the fallen leaves and oil pollution have been cleaned up, which has greatly improved public area hygiene and factory environment.

In response to the feedback from the special working group of the Pingkuang Group on November 16-17, Anyuan Pipeline Company attached great importance to it, and implemented reforms. On November 18th, organize employees to tidy up the materials at the entrance of the logistics department and the PE raw material warehouse and cover them with tarpaulins; organize and remove the workshop pallets and tons of bags to keep the workshop site clean and tidy with unobstructed passages; put the pipe fittings in front of the warehouse The scattered pipe plugs at the flower bed are cleaned and stacked neatly; the oil leakage problem of the 4# mold temperature machine is repaired; the pump room equipment, the floor of the power distribution room, the counter surface, the glass, the window sill, and all kinds of appliances are completely cleaned up. Following up, various rectifications are also in full swing.(Text/Li Qing, Picture/Tang Sang)

Hotline

0799-6796868

Scan Follow Us